Renovation Weeks Eleven and Twelve by Westheights | Sep 20, 2014 | Events This week, Ryan Terpstra’s (our electrician) update of the renovation is succinct: 240 sheets of drywall went up Boiler is gone and old water rads are gone Site Visit New Door into church from the Portable Cutting out the window to create the new fire door into sanctuary New Fire Door into Sanctuary Electrical doodads, an homage to Ryan Drywalled vestibule walls at front door New tech booth in sanctuary Peek into the new tech booth Foyer right; washrooms to the right Main floor foyer Perspective from basement exterior door Drywall – Class to the right of the kitchen Standing at basement double doors Basement Classroom Addition Perspective from basement large group area Perspective from basement large group area